Physics

A coolie A takes 1 minute to lift a load to the roof of a bus whereas coolie B take 2 minutes to lift the same load to the roof of the same bus. The work done by B is:

  1. equal to work done by A
  2. greater than work done by A
  3. less than work done by A
  4. none of the above.

Work, Energy & Power

26 Likes

Answered By

11 Likes


Related Questions